Hole #13 before pruning.
Hole #13 after pruning.
Hole #12 after pruning left side and right side of tee area.
The above pics show the tremendous trimming efforts we have employed during this mild winter. We have recently rented boom lift for our ongoing annual tree trimming program. The pics are clear evidence of the need to continue this program each year. We have been all over the course trimming back overgrown areas that impede the fairness and playablity of each hole. I really believe the trimming is a necessity since nothing was done, with regards to pruning trees ever it doesn't appear. This process is also done to cut any deadwood out of the trees around the golf course, which affect the trees health. Many will appreciate the new open views of many of the holes on the golf course.
Mike O'Neill
Superintendent
Tuesday, February 14, 2012
Wednesday, February 1, 2012
New Tee Marker Feature for Broken Tees
The problem of broken tees littered all over the teeing surface starts to really slow down maintenance as well as give the tee area an untidy appearance. The idea of sticking a separate box out on the tee surface to collect broken tees seems to look a little messy to me. This year we have drilled a 2" hole in the top of every tee marker on the golf course. We have done this as an attempt to focus all of the broken tees into the top of the tee marker. We figured if the tees stay in the tee marker, great, if not the broken tees will be concentrated around the marker to allow a quicker clean up by the maintenance staff. So please try to place your broken tee in the top of the tee marker to make our job easier as well as allow the tee area to look that much cleaner, Thank you.
Mike O'Neill
Superintendent
Wednesday, January 25, 2012
Tree Work through this Mild Winter on the Golf Course
The grounds staff has had the opportunity to get out on the golf course and work on some tree pruning and removal with the mild winter weather we have experienced so far. In the above pictures we are cutting back the the overgrowth on the left side of the 11th hole. We will continue to remove any overgrowth around the golf course to provide a more fair and enjoyable experience for the members and golfers of all skill levels.
Friday, December 16, 2011
Trees to be removed this winter
There are a few trees on the golf course that are in a severe state of decline. As the above photos show, the trees are extremely weak and are a safety concern for anyone near these trees as they continue to drop limbs. The first two photos are from the maple tree at the right and beginning of the 9th fairway. This tree has been in a state of decline for over 6 years. The tree is a safety issue as well as a maintenance problem as it continuously drops dead limbs to the ground. The second photo shows what happens as the dead debris falls from the tree and creates a mess below the tree. The final photo is from another dying maple at the beginning, right of 10 fairway. This tree does not impact playability and is more of an eye sore than anything. It is easy to see all the dead limbs still in theses trees which represent the safety concerns with these trees.
Wednesday, December 14, 2011
#18 Project Update
As the above photos show, the new bunker on 18 is shaped out and and ready for the winter. We are at a point now where we are ready to fine grade and sod as soon as we can in the spring. If we were to sod now, the sod would not make it through the winter. In the spring we will compact the bottom of the bunker and prepare to add the sand. I believe this bunker along with the new hole orientation and changes to the landing area, will greatly improve the playability of this hole for all skill levels.
Friday, October 14, 2011
18 Master Plan Project
![]() |
| The excavator we used to shape the new bunker. |
![]() |
| Removing soil from the new bunker. |
![]() |
| We ran into numerous large rocks, glad we had an excavator to remove and continue to shape the new bunker. |
Mike O'Neill
Superintendent
Thursday, October 6, 2011
# 18 Master Plan Project Underway
We have begun work on the master plan project for the 18th hole. Essentially what will happen is the first fairway bunker on the left will be removed filled in and regraded to the natural contour of the surrounding topography. We will also reposition the first bunker on the right of the fairway to become a longer bunker running parallel to the fairway. Last, the fairway will be widened on both sides of the fairway and will provide a bit more forgiving landing area off the tee. The pictures above show some of the work in process. We have removed whatever good sand that remained in the bunker and will be re-using it in the new bunker. Also, the picture with the red flags in it designate where the "new" bunker will be. The picture with the white line in it marks where the new fairway edge will be. The project will take a few weeks to complete and the finished product will not be realized until next season but I believe the change will definitely be positive and allow the hole to play how it should play. As a result of the construction going on, the entire area will remain "Ground Under Repair" until further notice.
Mike O'Neill
Superintendent
Subscribe to:
Posts (Atom)








