Wednesday, April 24, 2013

Fairway Expansion #8



The fairway expansion on hole #8 near the pond is complete.  We have opened up the fairway as the master plan states around the pond, apparently to act as a type of bail-out area for golfers.  We have also overseeded the rest of the rough area and added some more stone around the pond. The area will need some warmer temps and time to fill in so please stay off the entire area as we get everything filled in and growing the way we want it to.

Mike O'Neill, GCS

Tuesday, April 16, 2013

Finally off and Running!


After a very, very slow start and some recent wet weather we have started the mowing process.  Yesterday we double cut fairways...that's right double cut because we weren't satisfied with the single cut.  Coming out of winter some of the fairways are extra "shaggy"so we mow them until they look acceptable.  Also, please note the bottom picture of the brand new intermediate rough mower we have implemented today as well.  We will be cutting the intermediate rough right around the greens  and par 3 greens as we finally have a mower that can do the job properly.

Mike O'Neill, GCS

Monday, March 18, 2013

Drainage Work on #10 Fairway



Our recent attempt to drain the terribly wet landing area on the 10th fairway.  We rented an 8' auger attachment for our skid steer.  We then installed a vertical riser pipe which will have a metal grate on top to collect surface water.  We will then be trenching in pipe to divert water into the sump.  We did run into some clay at a depth of 6', which would explain why the area does not drain very well.  The hope is that the sump will collect the water and slowly drain through to the bedrock beneath.

Mike O'Neill, GCS

Friday, March 1, 2013

New Driving Range Target Flags And Pins

Above is the new look of what we will be installing on the driving range as target flags this spring.  The post is a 4x4 that we will concrete in the ground at every given yardage to create a much neater and more visible target for golfers to aim at while practicing on the driving range.  We feel these pins will be a big improvement for golfers looking to have something a little bigger to aim at as opposed to the skinny, barely visible flags we have had in the past.

Mike O'Neill, GCS

Monday, February 25, 2013

Improving The Weakest links On The Golf Course




Well here we are just about into March as I write this, with snow on the ground we look ahead to the warmer days of spring.  While looking ahead, we as a maintenance staff plan how we can improve the golf course every year while mainly targeting the weakest parts of the course.  This spring we are planning a few projects that will drastically improve weak areas of the course.  The first project we will address with regards to the master plan will be re-doing the 11 men's tee.  The tee is very uneven and thinned turf exists there as a result of a wear and shade issues from the trees to the east and west effecting morning and late afternoon sunlight to the tee.  Bottom line is...Trees and quality turf do not coexist.  We will level, re-position and sod the tee to drastically improve the area. The tee will remain the same size but the fact that it will be level, aim in a direction towards the landing area,  will allow us now to be able to use the entire teeing area.

Mike O'Neill, GCS

Tuesday, February 12, 2013

Re-doing Oak Benches For The Golf Course


Every winter we go through and refurbish numerous course accessories and the oak benches on the course are a part of that process.  As you can see from the pictures above, the benches are first broken down.  We then proceed to use a planer to remove the old cracked stain.  We will then sand them and re-stain with a high quality, marine grade stain.

Mike O'Neill,  GCS

Tuesday, January 29, 2013

Building Trailers For Our New Greens Mowers.







Even though it is cold and snowy outside does not mean the grounds staff has it easy in the winter.  We are currently right in the middle of fabricating trailers for our new John Deere greens mowers.   These trailers will allow us to trailer the mowers around the golf course to efficiently and effectively get the greens mowed in a very timely manner.  We have some very talented staff members that have the ability to weld and fabricate these materials and save the club thousands of dollars in the process.  The completed trailer pictured above cost $1800 to purchase a few years ago.  We are completing the new trailers in-house for  less than 1/4 of that price.  

Mike O'Neill, GCS